In Sumatera system, a 275kVAC line to connect Northern and Southern part of Sumatera is planned to be in operation by 2010. It is indicated that large scale of mine mouth power plants can be constructed in east Sumatera. For that reasons, a link of mine mouth in south and central Sumatera should be considered to anticipate power transfer to the north and export to Malaysia in the future. The basic form of an HVDC converter consists of a 6 pulse bridge using thyristor valves. A thyristor valve may contain many individual thyristors assembled in series and parallel combination to provide the required voltage and current ratings. The most commonly used converter configuration is 12 pulse arrangements which is a combined unit of two 6 pulse converters. The converters naturally produce harmonics. The higher the converter pulse number, the lower the harmonics produced. However, studies have shown that 12-pulse arrangement is the optimal configuration for HVDC transmission based on the overall cost, including the cost of converters and the filters.

在苏门答腊岛供电系统中,一条连接苏门答腊岛北部和南部的275kV的交流输电线路计划在2010年投入运营。这表明在苏门答腊岛东部即将建成大规模的坑口发电厂。基于这个原因,我们应该考虑在苏门答腊岛南部和中部的坑口电厂之间建立一条输电通道,以便将来向北方输送电力并出口到马来西亚。

高压直流变换器的基本形式是由使用可控硅整流阀的6脉冲电桥组成。可控硅阀可包含许多独立的可控硅元件,这些元件以串联和并联的方式组合在一起,以提供所需的额定电压和额定电流。最常用的直流变换器是由两个6脉冲变换器组合而成的12个脉冲变换器。

变换器在工作中具有产生谐波的特性。变换器脉冲数越高,产生的谐波含量越低。然而,研究表明,基于总成本(包括转换器和滤波器的成本)的考虑,12脉冲配置是高压直流输电传输的最佳配置。

0 likes

Related articles

英译汉习作一篇

翻译的书稿节选

纪录片翻译稿节选

协议翻译

变电站西译中

仓库资料-中译英


Most liked articles